Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Allocation is measured in full-time engineers/employees (FTEs). FTE’s is a calculation of the ratio of time spent on a given piece of work in a day multiplied by the average daily salary for engineers at your company. Each action taken on various pieces of work influences the ratio for each day. Our model is most accurate when your team’s work is performed in a tracking system like Git or Jira.

TL;DR

Allstacks looks at all commit and card activity in connected tools to determine how each individual is spending their time over the course of each workday. This is done by measuring the time between each action. If Action A is performed at 1pm, and Action B is performed at 2pm, Action B will receive an hour of credit.

...